Logo
Contact Us! 609-466-3400
  • Home
  • Products
    • Air Conditioners
    • Centrifugal & Packaged Blowers
    • Fans and Fan Trays
    • Heat Exchangers
    • Custom Cooling Design
    • Enclosure Accessories
    • Spare/Replacement Parts
    • Product Documentation
  • Industries
    • All Industries
    • Self-Service Kiosk
    • Food & Beverage
    • Water Treatment
    • Industrial Manufacturing
    • Medical Technology
    • Infrastructure
    • Hazardous Locations
  • Sizing
  • About Us
    • About Kooltronic
    • Kooltronic and the Environment
    • Virtual Tour
    • Kooltronic Timeline
    • Quality Standards
    • Services
    • Careers with Kooltronic
  • Contact Us
    • Sales Team
    • Contact Us
    • After Sale Kare (ASK)
  • Blog

Kooltronic Timeline

1956
Kooltronic original building

The Beginning

Founded to address the needs of the emerging electronics industry, producing Blowers and Fans. A 5,000 square foot facility was established in Princeton, NJ.

1960-70's
Original enclosure cooling devices

Innovation

Developed Heat Exchangers and patented the first Air Conditioners for sealed enclosures.

1963
Ventura, CA manufacturing facility

New Facility - Ventura, CA

West Coast facility was established in Ventura, CA.

1975
Hopewell, NJ manufacturing facility

New Facility - Hopewell, NJ

Moved operations from facility in Princeton, NJ to 100,000 square foot facility in Hopewell, NJ.

1980's
Air Conditioner assembly line

Industry Leader

Evolved into the industry leader, specializing in the design and production of UL Listed Air Conditioners.

1984
Automated powder paint line

Powder Paint System

Added 22,000 square feet to Hopewell facility, which housed a new powder paint system and provided additional warehousing space.

1990's
Custom Air Conditioner

Custom Products

Expanded upon expertise in specialty, high volume, custom refrigeration products for OEM applications.

1999
New Pennington, NJ manufacturing facility

New Facility - Pennington, NJ

Moved into current 170,000 square foot facility, upgrading R & D, Test Laboratory and Production Equipment.

2006 & 2011
New 3,900 solar panel installation

Solar Panels

2006: Solar system installed on roof of building, covering 60% of electricity requirements of the facility.

2011: Solar canopy installed over parking lot, covering an additional 30% of electricity requirements of the facility for a total of 90% between the two systems.

2015
New Hazardous Location air conditioners

Hazardous Location AC

Introduced patented Hazardous Location Air Conditioner product line into the marketplace.

Footer logo
Wednesday, January 27, 2021  
©2021 Kooltronic, Inc. - All rights reserved.
Terms of Use
Contact Info:
Kooltronic, Inc.
30 Pennington-Hopewell Road
Pennington, NJ 08534 USA
609-466-3400
800-321-KOOL
Contact Us
Popular links:

Product Sizing and Selection
Catalogs/Brochures
Virtual Plant Tour
Sales Team
Kooltronic Blog

LinkedIn profile icon Twitter profile icon YouTube profile icon Facebook profile icon Kooltronic Blog icon
ISO-9001 logo Made In USA logo